Decommissioning · Compliance · Capital

Nigeria's offshore assets are ageing.
Someone has to bring them home.

Meridian Decommissioning Partners is the Nigeria-anchored advisory, project management and capital firm built for the country's emerging $10–15 billion decommissioning wave - bridging North Sea execution discipline with deep operator and regulatory fluency.

$10–15bn
Estimated upstream D&A liability across Nigeria's offshore & onshore assets
250+
Producing OMLs / OPLs now subject to PIA decommissioning obligations
<20%
Of operators have adequately funded their D&A escrow accounts
3
Integrated service lines under one Nigerian-content compliant entity
The Mandate

The Petroleum Industry Act turned decommissioning from a someday problem into a funded, audited, board-level obligation.

For decades, ageing wells, flow stations and platforms were left idle without proper dismantling. The PIA 2021 changed that - Sections 232–233 require every licensee to maintain a funded D&A programme. The Decommissioning & Abandonment Regulations 2026 then moved the obligation to the front of the project: a D&A plan is now a condition of Field Development Plan approval, not an end-of-life formality.

The IOC divestiture wave has handed indigenous operators world-class assets - and the legacy liabilities that come with them. Most have the budget and the urgency, but no in-house decommissioning function. That gap is our market.

Enforcement now carries a price. The 2026 Regulations impose US$500,000 per year for a missing plan or unfunded escrow, and US$1,000,000 for decommissioning without approval. Offshore campaigns require a 60-month application lead time.

Combined upstream + midstream D&A exposure
$14–20bn
Legacy D&A plans under NUPRC review
65+
Operators with plans in the queue
48+
Escrow funded against requirement
<$1bn
Penalty per year for a missing D&A plan or fund (2026 Regs)
$500k
Sources: NUPRC 2024 Annual Report · National Assembly D&A Committee, 2025 · D&A Regulations 2026 (S.I. 15 of 2026) · Wood Mackenzie / IHS estimates
One Entity · Three Pillars

From regulatory plan to final lift - and the capital in between

Operators don't want to assemble a decommissioning programme from a dozen disconnected vendors. Meridian is the single accountable partner across the full scope, registered under one Nigerian entity holding the relevant NUPRC OGISP permits.

PILLAR 01

D&A Advisory / Compliance

NUPRC OGISP · Decommissioning & Technical Consultancy

We make operators audit-ready: full D&A programmes built to PIA Sections 232–233, ready for NUPRC submission and defensible at review workshop.

  • D&A plan preparation & NUPRC submission (2026 Regs)
  • Decommissioning cost estimation (well & field level)
  • Escrow structuring & contribution scheduling
  • Legacy liability assessment for post-divestiture operators
  • D&A due diligence for M&A transactions
PILLAR 02

Project Management & Integration

NUPRC OGISP · Decommissioning Services · PMC

We are the Nigeria-based PMC layer that turns plans into executed scopes - sourcing and managing international specialists while keeping Nigerian Content at the centre.

  • Well plug & abandonment campaign management
  • Topsides & substructure removal integration
  • Subsea infrastructure & pipeline decommissioning
  • Specialist contractor prequalification & tendering
  • HSSE, interface & NCDMB compliance management
PILLAR 03

Capital & Asset Monetisation

NUPRC OGISP (IV) · Financial & Management Advisory

The decommissioning bill doesn't have to be dead weight. We structure the financing and recover residual value others leave on the seabed.

  • USD escrow structuring with A+ rated custodians
  • Residual scrap & equipment value recovery
  • Distressed decom-asset acquisition & structuring
  • Decommissioning fund & co-investment facilitation
  • Post-decommissioning environmental monitoring economics
Why Meridian

The bridge no competitor currently occupies

International specialists know how to decommission. Indigenous contractors know Nigeria. Almost no one sits credibly in both worlds - with the regulatory fluency and capital capability to match.

Regulatory fluency, earned

Direct working experience inside Nigeria's upstream regulatory environment - the difference between a D&A plan that clears review and one that bounces.

Live operator relationships

Active account-level relationships across Nigeria's largest deepwater and development operators - your beachhead is a conversation, not a cold tender.

Capital under the same roof

A private-equity-grade capability to structure escrow vehicles, recover residual value and fund the work - uniquely paired with the advisory itself.

North Sea discipline, applied

We adapt the proven UK decommissioning Work Breakdown Structure to Nigeria's NUPRC framework - transferring two decades of execution learning into the basin.

The Meridian WBS

Eight stages, mapped for Nigeria

Our decommissioning Work Breakdown Structure adapts proven international practice to Nigeria's regulatory reality — every stage tied to a NUPRC deliverable and a Nigerian Content milestone.

MERIDIAN DECOMMISSIONING PARTNERSNigeria Decommissioning Work Breakdown StructurePIA 2021 S.232–233 · D&A Regulations 2026 (S.I. 15 of 2026)NCDMB Nigerian Content · Commenced 9 March 202601Plan &PermitD&A plancost estimateescrowNUPRC approvalReg. 3 · 19Nigerian-led PMC02WellP&ABarrier designplug & abandonwellhead recoveryReg. 5 · 7Local crew & logistics03MakeSafeCleanflushisolateNORM surveyReg. 5(13)Local cleaning svc04TopsidesRemovalLiftsea-fastentransportquayside load-inReg. 6 · 11Local barge & ports05SubstructureRemovalJacket cutpile severancedebris clearanceReg. 6(3)Yard reverse-eng.06Subsea &PipelinesManifoldsumbilicalsflowlinespipeline decomReg. 6(3)Local ROV/subsea07Recycle &WasteOnshore dismantlerecyclescrap recoveryReg. 5(13)(f)Nigerian yards08Remediate &MonitorSite remediationpost-decom monitoringclose-outReg. 15Local enviro svcAPPLICATION LEAD TIME - Offshore: 60 months before commencement (Reg. 6) · Onshore: 12 months (Reg. 5(11)–(12)) · Public consultation required before approval (Reg. 13)Eight integrated stages · one Nigerian-content compliant entity · sequenced to NUPRC deliverables under the 2026 Regulations= Nigerian Content emphasis
How We Work

A single, sequenced scope of work

Built on the internationally recognised decommissioning Work Breakdown Structure - adapted for Nigerian Content obligations and Niger Delta community context at every stage.

STAGE 01

Plan & Permit

D&A programme, cost estimate, NUPRC submission and regulatory interface.

STAGE 02

Well P&A

Plug and abandonment campaign planning, contractor management, execution oversight.

STAGE 03

Make Safe

Cleaning, isolation, draining, flushing and hydrocarbon-free certification.

STAGE 04

Remove

Topsides, substructure and subsea infrastructure removal and transport.

STAGE 05

Recycle

Onshore dismantling, NORM handling, recycling and residual value recovery.

STAGE 06

Monitor

Site remediation, post-decom environmental monitoring and close-out.

Every stage maps to NUPRC deliverables and Nigerian Content milestones - compliance is built in, never retrofitted at audit.

Start the conversation

Get a decommissioning readiness briefing

A focused session on where your assets stand against PIA D&A obligations, what a funded programme looks like, and how to move before enforcement does.

Request a briefing →
NUPRC OGISP-aligned Nigerian Content compliant Confidential & obligation-free